What does it take to see your custom home designed and built to your specific budget/style/needs?
Initial Planning
Define Your Goals and Budget
Determine your needs and wants.
Establish a realistic budget.
Plan for contingencies (usually 10-20% over budget).
Research and Gather Information
Research home styles and design ideas.
Look into local building regulations and zoning laws.
Explore financing options and get pre-approved for a mortgage if necessary.
Site Selection and Preparation
Site Survey and Documentation
Site Survey obtained by Client.
Plat obtained by ClientÂ
HOA Requirements were obtained by the ClientÂ
Local Covenants obtained by ClientÂ
Soil testing is obtained by the ClientÂ
Perc Testing was obtained by the ClientÂ
Septic Survey and Requirements obtained by ClientÂ
Site Selection
Select a suitable location considering proximity to work, schools, and amenities.
Evaluate topography, soil quality, and environmental risks.
Purchase the land after conducting a land survey and ensuring zoning compliance.
Design Phase
Assemble Design Team
Hire an architect, structural engineer, and possibly an interior designer and landscape architect.
County/City/Parish, etc. Requirements obtained by the Project Team.
Concept Development
Conduct a site visit by the Design Team and licensed contractor.
If rezoning is required, collaborate with the client, the design team, and the licensed contractor.
Develop schematic layout and overall home design concept.
Select home location and orientation.
Create interior and exterior design concepts.
Develop a landscape design solution for all designated outdoor livable spaces.
Develop a complete site plan for approval.
Generate exterior and interior 3D renderings and visualizations.
Design Finalization and Permits
Detailed Design and Construction Documents
Complete all architectural details
Create building and room perspectives
Prepare cover sheet
Develop architectural floor plans
Draw interior and exterior elevations
Draft building sections
Produce construction drawings
Create window and door schedule
Provide an itemized construction budget cost sheet with finalized pricing
Draft framing plans, including ceiling, roofing, and framing
Detail wall framing
Include full engineering details
Generate structural engineer’s report
Obtain structural engineer’s stamp
Material and Fixture Selection
Selection of all architectural elements, material selections, and specifications.
Finalized interior fixtures and finish selections.
Finalized interior furniture design and selection.
All finalized interior materials room by room selections and specifications.
Finalized BIM-generated landscape design site plan.
Finalized color renderings of outdoor landscape design for visualization.
Specifications and placement of hardscape and selected vegetation.
Pre-Construction
Utility and Permit Preparation
Ensure electricity is on site.
If there is no septic, connect to town water/sewer.
Ensure HOA/Neighborhood guidelines are met for approval (if required).
Ensure Historical Preservation guidelines are met for approval (if needed).
Ensure local covenants are met for approval (if required).
A licensed contractor submits a permit application to the city, county, parish, etc.
Address the necessary changes and provide notes from the approving entity
Driveway permit application.
Submit all the necessary construction documents for a construction loan.
911 address identification and services.
Construction Phase
Site Preparation
Clear the site.
Excavate for foundations.
Prepare the site for utility connections.
Foundation and Structure
Lay the foundation and ensure waterproofing.
Frame the house (walls, roof, floors).
Install windows and exterior doors.
Choose and install roofing materials.
Install utility systems (electrical, plumbing, HVAC).
Perform regular inspections during installation.
Exterior and Interior Finishing
Complete exterior finishes (siding, paint).
Install insulation and drywall.
Paint and apply wall finishes.
Install flooring (tiles, wood, carpet).
Fit out bathrooms and kitchens (fixtures, cabinets, countertops).
Final Installations
Install lighting fixtures and interior doors.
Plan for smart home integration.
Ensure all systems (plumbing, electrical, HVAC) are functioning correctly.
Final Steps
Landscaping and Outdoor Spaces
Implement landscape design plan.
Install driveways, walkways, and patios.
Choose native and drought-resistant plants.
Final Inspections and Move-In Preparation
Conduct final inspections to ensure compliance with building codes.
Perform a final walkthrough with the contractor.
Arrange for professional cleaning.
Schedule utility connections and transfers.
Plan and execute your move.
Post-Construction
Home Maintenance and Documentation
Develop a regular maintenance schedule.
Keep a log of warranties and maintenance activities.
Digitize and store all necessary documents.
Lifestyle and Personalization
Customize living spaces according to your lifestyle.
Plan for future-proofing (aging in place, family growth).
Integrate with the local community.